Construction Update (page 28)
|
November 24th. The oven is in.
|
|
|
Putting in the basement kitchenette sink.
|
|
Refrigerator.
|
|
|
Basement bathroom sink. Andrew and Derrick note that Mom specifically determined that the left side is a changing table area.
|
|
November 25th. Putting up the sliding door for the theater.
|
|
|
Crown molding is up.
|
|
November 26th. More crown molding.
|
|
|
The sliding door.
|
|
The garage door openers are wired. Soon I can move in!
|
|
|
With the new front door, the front entry system is complete (especially with Becky's added touch).
|
|
November 28th. The basement column is being set and the baseboard is going in to prepare for carpeting.
|
|
|
The baseboard in the theater looks like it was pretty tricky.
|
|
November 30th. Before heading off to Andrew and Kendra's wedding, I got some more audio-visual work done. I installed the cabling for the projectors and the ceiling mount for the theater projector. I did a test set up to see how it projected and was happy with the result.
|
|
|
December 3rd. The microwave and hood are in.
|
|
Mantle is not done yet but showing progress.
|
|
|
New bench.
|
|
Long view of basement great room.
|
|
|
Entry cabinet with Becky's words of encouragement.
|
|
Bathroom vanities.
|
|
Construction Update (page 29)