Rand's Web Page
Construction Update (page 4)
|
May 5th.
|
|
|
Garage footings.
|
|
|
These are the lego blocks that we will be building our house with.
|
|
|
Underground plumbing is in.
|
|
May 6th.
|
|
|
Insulation for the concrete floor.
|
|
May 7th
|
|
|
The underfloor heating is in and awaiting a concrete pour.
|
|
|
Footings for the front entry.
|
|
Deeper sections of basement for media room and possible future elevator.
|
|
|
Footing for stair from garage in background.
|