May 5th.





Garage footings.





These are the lego blocks that we will be building our house with.



Underground plumbing is in.


May 6th.


Insulation for the concrete floor.


May 7th




The underfloor heating is in and awaiting a concrete pour.






Footings for the front entry.


Deeper sections of basement for media room and possible future elevator.


Footing for stair from garage in background.