Construction Update (page 9)
|
June 4th.
|
|
|
Bedroom #1
|
|
Bedroom #2
|
|
|
The exercise room.
|
|
Great room (picture pool table and foosball).
|
|
|
Kitchenette (and poker room).
|
|
Media Room.
|
|
|
Maintenance shed.
|
|
Media room from above.
|
|
|
June 5th. Note the much easier system for screwing in the floor.
|
|
The floor is going on but now the rain is falling.
|
|
|
June 6th. Foreground shows them laying out for the master bedroom and closet.
|
|
The garage floor is close to ready for a pour.
|
|