Rand's Web Page


Construction Update (page 9)



June 4th.



Bedroom #1


Bedroom #2



The exercise room.


Great room (picture pool table and foosball).



Kitchenette (and poker room).


Media Room.


Maintenance shed.


Media room from above.


June 5th. Note the much easier system for screwing in the floor.


The floor is going on but now the rain is falling.


June 6th. Foreground shows them laying out for the master bedroom and closet.


The garage floor is close to ready for a pour.


Construction Update (page 10)

Construction Update (page 8)

Construction Update (page 1)