Construction Update (page 17)
|
July 20th. Becky's library window is roughed in and the shed dormer finished.
|
|
|
Some internal archways are roughed in.
|
|
Sliding doors are getting started.
|
|
|
Guest shower.
|
|
Basement bathtub.
|
|
|
July 24th.
|
|
The archway entrance was roughed in.
|
|
|
This archway had to be lowered. A lot of the work this week was wiring and plumbing rough-ins.
|
|
July 25th. We confirmed colors with the architect and contractor today.
|
|
|
More lighting and electrical work.
|
|
Most of the plumbing rough-in is complete. This is the master shower.
|
|
|
I hope I don't have to untangle all that wiring.
|
|
July 28th. The entry window is roughed in.
|
|
|
Many windows were installed.
|
|
July 29th. The windows are nearly all in.
|
|
|
The final touches of the electrical rough-in are being done.
|
|
The rough in for the roll-up door into the media room.
|
|
Construction Update (page 18)
Construction Update (page 16)
Construction Update (page 1)