Construction Update (page 17)



July 20th. Becky's library window is roughed in and the shed dormer finished.



Some internal archways are roughed in.


Sliding doors are getting started.



Guest shower.


Basement bathtub.



July 24th.


The archway entrance was roughed in.


This archway had to be lowered. A lot of the work this week was wiring and plumbing rough-ins.


July 25th. We confirmed colors with the architect and contractor today.


More lighting and electrical work.


Most of the plumbing rough-in is complete. This is the master shower.


I hope I don't have to untangle all that wiring.


July 28th. The entry window is roughed in.


Many windows were installed.






July 29th. The windows are nearly all in.







The final touches of the electrical rough-in are being done.


The rough in for the roll-up door into the media room.