Construction Update (page 18)



July 30th. The electrician stubbed in a place to power the elevator (if it ever goes in).



All these wires are to control the different heating zones.


More stub-ins for future technology, in this case, the projector.



More windows including the nook.


Basement windows are in too.



July 31st. The window on the left was roughed in too small but is corrected now.


Looking toward the kitchen from the dining room.


The networking cabinet. Eat your heart out Derrick.


Not much change here. Just a better view.


Two more different views.




August 1st.


The base trim is in. A second layer of Tyvek is on in anticipation of the stucco. Most of the exterior doors are in.


Garage and side entry doors.


Shop door.


The living room all lit up with natural evening light.


August 4th. The soffits on the back side were completed.



They are moving a lot of dirt.


The pile that hid this view has been cut in half.


August 5th. Getting ready for putting on stucco and brick. The garage doors are starting to go in.


Decorative window above garage.


Don't ask me what these are for. I'll find out when you do.


Not the front door but the sidelights are right.






Construction Update (page 19)