July 30th. The electrician stubbed in a place to power the elevator (if it ever goes in).
|
|
|
All these wires are to control the different heating zones.
|
|
More stub-ins for future technology, in this case, the projector.
|
|
|
More windows including the nook.
|
|
Basement windows are in too.
|
|
|
July 31st. The window on the left was roughed in too small but is corrected now.
|
|
Looking toward the kitchen from the dining room.
|
|
|
The networking cabinet. Eat your heart out Derrick.
|
|
Not much change here. Just a better view.
|
|
|
Two more different views.
|
|
August 1st.
|
|
The base trim is in. A second layer of Tyvek is on in anticipation of the stucco. Most of the exterior doors are in.
|
|
|
Garage and side entry doors.
|
|
Shop door.
|
|
|
The living room all lit up with natural evening light.
|
|
August 4th. The soffits on the back side were completed.
|
|
|
They are moving a lot of dirt.
|
|
The pile that hid this view has been cut in half.
|
|
|
August 5th. Getting ready for putting on stucco and brick. The garage doors are starting to go in.
|
|
Decorative window above garage.
|
|
|
Don't ask me what these are for. I'll find out when you do.
|
|
Not the front door but the sidelights are right.
|
|