Construction Update (page 19)
|
August 6th. The whatzits have more finish.
|
|
|
More soffits went in.
|
|
August 7th. The fireplace went in.
|
|
|
Foam insulation for the walls.
|
|
Insulating the garage.
|
|
|
August 8th. Most of the foam is in.
|
|
Starting the drywall on the basement ceiling.
|
|
|
August 11th. More drywall went up. This is the basement bathroom.
|
|
The whatzits get some metal trim.
|
|
|
August 12th. The garage doors are being installed. We should be able to lock it up soon.
|
|
One of the basement bedrooms.
|
|
|
The maintenance area gets a ceiling.
|
|
Plastic is up in anticipation of a ceiling for the living room.
|
|
|
August 13th. Becky's study has a ceiling.
|
|
Looking toward the theater.
|
|
|
The basement kitchenette.
|
|
The garage got the rest of its insulation.
|
|
|
August 14th. Ceiling in the Living Room
|
|
Insulation of the media room/theater.
|
|
|
August 15th. The kitchen and dining nook get a ceiling.
|
|
Entryway.
|
|
|
The gallery.
|
|
August 20th. The foam backing for the stucco is going on.
|
|
|
More drywall inside.
|