Construction Update (page 19)



August 6th. The whatzits have more finish.



More soffits went in.


August 7th. The fireplace went in.



Foam insulation for the walls.


Insulating the garage.



August 8th. Most of the foam is in.


Starting the drywall on the basement ceiling.


August 11th. More drywall went up. This is the basement bathroom.


The whatzits get some metal trim.


August 12th. The garage doors are being installed. We should be able to lock it up soon.


One of the basement bedrooms.


The maintenance area gets a ceiling.


Plastic is up in anticipation of a ceiling for the living room.


August 13th. Becky's study has a ceiling.


Looking toward the theater.


The basement kitchenette.


The garage got the rest of its insulation.



August 14th. Ceiling in the Living Room


Insulation of the media room/theater.


August 15th. The kitchen and dining nook get a ceiling.


Entryway.


The gallery.


August 20th. The foam backing for the stucco is going on.



More drywall inside.