Rand's Web Page
Construction Update (page 21)
|
September 2nd. This is the color. I hope you like it. We do.
|
|
|
Here it is matching up with the brick.
|
|
September 3rd. More brickwork and sidewalks have gone in.
|
|
|
We are at the difficult point of having to pick wall colors. We are getting some professional help.
|
|
September 4th. Finally got this pillar done.
|
|
|
This guy was tall enough to do the basement ceiling without stilts or ladder. The basement is eight feet tall. This is nine and ten feet tall.
|
|
Dining room.
|
|
|
The patio is in.
|
|
September 5th. Only a missing window keeps them from finishing all the brick work.
|
|
|
September 8th. These are the drilling rigs for the wells for the geothermal system.
|
|
|
The electrician was kind enough to hook us up after hours so as not to disturb any of the other workers.
|
|
September 9th. More base coat of stucco.
|
|
|
Drilling more wells. Messy work.
|
|
The maintenance room gets a coat of paint.
|
|
|
The carcasses for our cabinets. We were visiting to discuss some colors and countertop issues.
|
|
September 10th. The last two windows arrived and were installed.
|
|
|
Here's the outside view. Now they can finish the brick.
|
|
The stucco is waiting for some rain to pass before any more progress.
|
|
|
September 11th. The interior view of the new window for Becky's study.
|
|
The mechanical equipment is arriving.
|
|
Construction Update (page 22)
Construction Update (page 20)
Construction Update (page 1)