October 7th. Looks even better without the scaffolding.
|
|
|
The coffered ceilings in Becky's study are underway.
|
|
The finished accent wall in the living room.
|
|
|
I guess Becky isn't the only one with bold colors. This is the theatre. Yes, I picked the colors (with help from the designer).
|
|
The cabinets are filing in (filing cabinets?).
|
|
|
October 8th. The guest shower tile is complete awaiting grout.
|
|
The floor heat for the tile master bathroom.
|
|
|
October 9th. The kitchen and owner's entry have their flooring.
|
|
More geothermal plumbing preparations.
|
|
|
The master bath floor is poured and awaits tile (the warming coils are buried beneath).
|
|
October 10th. More work on Becky's study.
|
|
|
The kitchen is starting to come together.
|
|
October 13th. The doors were put on last Friday but after I had been through.
|
|
The tile went down in the entryway.
|
|
|
This was my project for the weekend. I ran out of brick and my skills were lacking, so this is as high as it will get. I will put a post on top.
|
|
October 14th.
|
|
|
This is Monty, the finish carpenter who has been building the pillars.
|
|
More tile for the master bath.
|
|