Construction Update (page 25)
|
October 21st. Here's an angle you haven't seen before. The dirt pile that obscured it has turned into a yard.
|
|
|
A lot of work was done while I was in Germany. Here is the guest bathroom.
|
|
The master shower tile is complete.
|
|
|
The dining hutch is looking beautiful (the picture doesn't tell the tale).
|
|
More kitchen work including the addition of the island.
|
|
|
The sewing room cabinetry.
|
|
Becky's hutch in the dinette.
|
|
|
October 22nd. This is the master bathroom. Hunting season is upon us so the work may slow down.
|
|
October 24th. The kitchen cabinets have their crown molding.
|
|
|
The guest whirlpool tub is in.
|
|
The coffered ceiling for my study is going in.
|
|
|
The geothermal system is working and heating the house now.
|
|
October 27th. We had our first snow of the fall. This weekend I finished the mailbox enough that we will be able to receive mail this winter. I also started seeding the lawn but it turns out to be a huge lawn and I have no more than a tenth of it done before the snow flew. Here is further progress on the coffered ceiling. Everything looks better in person.
|
|
|
This new cap for the stair wall looks better in person as well.
|
|
October 28th. This panel will cover the extra geothermal access site.
|
|
|
This is the first sign of finish plumbing.
|
|
This picture shows the ceiling a bit better.
|
|
|
The door trim is going on.
|